AngloGold Ashanti's Geita Gold Mine in Mwanza Region is Tanzania's largest gold operation and one of East Africa's most studied. Equipment selection mirrors the West African gold benchmarks with some regional adaptations.
Recommended class
- Primary loading: 70+ tonne mining shovel (CAT 374, Komatsu PC850, Liebherr R 966)
- Mining feeder: 35-45 tonne (CAT 349, Komatsu PC450, Hitachi ZX490LC-7)
- Truck loading: oversized 3.0+ m³ rock bucket
Tanzania-specific considerations
Mining-Act duty exemption available. Equipment ships via Dar es Salaam port with 6-8 week lead time. Inland transport to Mwanza/Geita typically 3-5 days. Komatsu's strong East African dealer presence is a meaningful advantage for ongoing service.